Research brief · 24 November 2026

AI data centres in the Middle East and North Africa

Energy, water and cost: what is being built, what it takes, what it costs, its wider impacts, where the numbers disagree, and the experts to ask.

Prepared by Rawad and our team at the request of Ricardo Khoury, for research assessing the impacts of AI. Every figure carries a numbered source in the full brief.

The short answer

Three questions, three answers

2%

Energy: small today, growing fast

UAE data centres used about 2% of the country's electricity in 2025. In Saudi Arabia the share could reach 2.8% to 11.6% by 2030, depending on how much AI is built. [4, 18]

Confidence: medium, the estimates differ

70%+

Water: a security question

Most Gulf countries get 70% or more of their drinking water from desalination. Most of a data centre's water is used off site, in making its electricity. [5, 9, 11]

Confidence: high on the risk, low on any single total

$9.20/W

Cost: cheapest to build, debated overall

Building costs about $9.20 per watt in the UAE, against $12 to $13 in Europe, Asia and North America. One study finds the total cost similar to the US. [14, 20]

Confidence: medium

The war has made security a cost: drones put three Amazon data centres out of action in March 2026. North Africa is at an earlier stage, with tighter power and water. [37, 40, 62, 63]

Numbers in brackets refer to the source list of the full briefing.

1 · What is being built

Announced is far larger than what runs

Operational, 2024290 MW
Operational, Q1 2026476 MW
HUMAIN target, 20301,900 MW
NEOM Oxagon (planned)1,500 MW
HUMAIN target, 20346,600 MW

Saudi Arabia, capacity in megawatts

The Middle East runs about 1.6 GW, with 2.6 GW in development and 13.8 GW in planning (JLL, mid-2026). [59]

The UAE and Saudi Arabia add 2 to 3 GW by 2030, still under 2% of the world's data-centre power. [13]

Egypt runs about 60 MW and Morocco 1.5 MW, against plans of hundreds of megawatts. [37, 40]

Sources: KAPSARC [4]; Deloitte [15]; JLL via DatacenterDynamics [59]; S&P Global [13]; Enterprise [40]; BMI (Fitch Solutions) [37].

2 · Energy

The world's data centres are doubling their electricity use

2024415 TWh
2025 (about +17%)485 TWh
2030, IEA base case945 TWh
2035, IEA base case1,200 TWh

World data-centre electricity use, terawatt-hours

About 1.5% of the world's electricity in 2024, just under 3% by 2030. [1]

AI-focused data centres grow fastest: their electricity use triples. [2]

The US (45%), China (25%) and Europe (15%) use most of it today. [1]

Source: IEA, Energy and AI (2025) and Key Questions on Energy and AI (2026) [1, 2]. 2025 = 415 TWh plus 17%.

2 · Energy

What it means for Gulf grids

UAE: about 173 TWh of electricity in 2025. Data centres took about 3 TWh (2%) by one estimate, 5.6 TWh by another, which expects 12.6 TWh (about 6%) by 2028. [18, 57] Saudi Arabia: 2.8 TWh in 2024 (0.85%). By 2030, KAPSARC's three scenarios: [4]

KAPSARC scenario, 2030CapacityElectricityShare of national demandWith efficiency measures
Baseline (little AI)about 1,050 MW10.16 TWh2.79%—
Moderate growthabout 2,000 MW20.15 TWh—17.62 TWh
High growthabout 4,100 MW42.23 TWh11.55%36.76 TWh

Efficiency measures cut demand by about 13%. Emissions in 2030 range from 5.8 to 24.0 Mt of CO₂ on a fossil grid; meeting the 50% renewables target cuts that by about 68%. [4]

Sources: KAPSARC, December 2025 [4]; The National (Wood Mackenzie figures) [18]; Emirates NBD Research [57].

2 · Energy

The region's power is mostly gas and oil

Natural gas70%
Oil20%
Renewables6%

Electricity in the Middle East and North Africa by source, 2024

Cooling already takes nearly half of peak demand; with desalination, close to 40% of the growth in demand to 2035. [56]

The 5 GW Abu Dhabi campus at 85% use: about 37 to 48 TWh a year, a fifth to over a quarter of the UAE's 2025 electricity. Our calculation. [18, 30]

Source: IEA, The Future of Electricity in the Middle East and North Africa [56]. Coal is under 5%. Confidence: high on the mix.

2 · Energy

Heat costs energy

1.5

Saudi data centres today

Average PUE, range 1.5 to 1.8: the total electricity a site needs for each unit its computers use. [4]

1.1

AI sites in cool climates

The best recorded value is 1.028. Cooling takes from about 7% of a site's electricity to over 30%. [1, 4]

+35–65%

More electricity in the Gulf

For the same computing, at a PUE of 1.5 to 1.8 against 1.1. Our calculation.

Where the power comes from: UAE renewables grew 117% from 2022 to 2025, to more than 7.7 GW, with a target of over 23 GW by 2031; Saudi Arabia targets 50% renewables. KAPSARC still finds Saudi Arabia cost-competitive at a PUE of 1.6 to 1.8. [4, 5]

Sources: KAPSARC [4]; IEA [1]; UAE Crosscurrents report [5]. “Our calculation” = our arithmetic from published figures.

3 · Water

Most of a data centre's water is not used on site

~50%

Making its electricity

Thermal power plants need cooling water. The World Economic Forum puts 72% of a data centre's water consumption off site. [5, 9]

~30%

Cooling on site

Chilled air, or cold treated water through plates on the chips. Evaporative cooling uses 1 to 3 m³ per MWh of computing, most in the hot months. [5, 9, 11]

The rest

Fuel, chips and building

Chip making is especially water-intensive; building large sites uses fresh water for concrete, dust control and cooling systems. [5, 11]

The Gulf difference. Gulf power plants are mostly cooled with seawater, which is not in short supply. [11] What matters here is the fresh water used for cooling on site, which usually comes from desalination or from treated wastewater.

Sources: UAE Crosscurrents report, with Eurasia Group [5]; World Economic Forum [9]; Enterprise [11].

3 · Water

Why the published numbers differ about twenty times

Direct cooling only (Rystad)644 bn L
Cooling + power + chips (IEA)1,200 bn L
Wider footprint (UAE report, UN University)9,320 bn L

Data-centre water worldwide in 2030, billion litres: the same question, three scopes

Today: 222 billion litres for direct cooling (2025), 560 billion with power and chips (2023), 4.5 trillion as a full footprint (2025). [5, 7, 11]

Ask any expert which one they mean.

Sources: Rystad Energy [7, 8]; IEA via Enterprise [11]; UAE Crosscurrents report [5]; UN University [6].

3 · Water

In the Gulf the water risk is security, not price

Desalination

Most Gulf countries rely on it for 70% or more of their drinking water. [11]

Capacity

MENA hosts over 40% of the world's desalination capacity, the GCC alone 33%. [29]

Security

Iranian strikes have hit desalination plants in Bahrain and Kuwait during the Iran war. [11]

Exposure

Nearly 40% of identified AI capacity worldwide is in areas of high or extremely high water stress. [3]

Real operator data

Khazna (UAE) used about 393,000 m³ in 2025; its DXB1 site is cooled with treated sewage effluent. [12]

Hot days

Evaporative cooling water can spike six to ten times above average on the hottest days. [23]

Market estimates

UAE 24 to 61 billion litres, Saudi 20 to 88 billion (2025 to 2030): far above Khazna's figures, unverified. [11]

Planning

The UAE's report finds MENA has the highest projected water stress for 2030. [5]

Sources: Enterprise [11]; IEA [3, 29]; Khaleej Times (Khazna ESG report) [12]; UC Riverside [23]; UAE Crosscurrents report [5].

3 · Water

The cooling trade-off: water or electricity

Dry cooling

  • Saves about 2.15 litres of water per kWh of computing
  • Needs an extra 0.30 to 0.74 kWh of electricity to do it [8]

Desalinated water

  • Desalinating those 2.15 litres takes about 0.003 to 0.011 kWh
  • At 1.55 kWh/m³ (Saudi record) to 5 kWh/m³ (conventional) [27]
30 to 220×

less electricity to cool with desalinated water than with dry cooling, measured in energy alone (our calculation). In the Gulf the case against water cooling is about water security, peak demand and brine, not energy.

Sources: Rystad Energy [8]; Zawya [27]; UAE Crosscurrents report [5].

3 · Water

What is already being done

Treated wastewater

Qatar and other GCC countries show major cooling can run on non-potable water; about 82% of the region's wastewater is never collected or treated. [24]

Liquid cooling

Gulf operators are testing systems that could cut cooling water by up to 90%; Khazna's planned 100 MW site in Ajman cools direct to the chip. [12, 24]

Planning

The UAE's report proposes a voluntary global declaration: permits tied to local water and energy, transparent reporting, water risk in siting. [5]

The UN Water Conference, co-hosted by the UAE, meets in Abu Dhabi on 8 to 10 December 2026. [5]

Sources: IWMI via Arab News [24]; Khaleej Times [12]; UAE Crosscurrents report [5].

4 · Cost

Building is cheapest in the Middle East

Tokyo (most expensive)$18.28/W
Europe, average$12.76/W
Asia, average$12.10/W
North America, average$12.06/W
Saudi Arabia$10.80/W
Qatar$9.80/W
UAE$9.20/W
Middle East, average$9.93/W

Construction cost, 2026, US$ per watt

451 Research: about $11 million per MW in the UAE and $13 million in Saudi Arabia, against $12 million in Europe and $13 million in North America. [13]

That is the building. The computers cost more: about $20 million per MW (our calculation from [21]).

Sources: Turner & Townsend Construction Cost Index 2026 [14]; S&P Global, 451 Research [13]; SemiAnalysis [21].

4 · Cost · our calculation

One megawatt of computing in the Gulf, for one year

Electricity1 MW × 8,760 hours × PUE 1.5 = about 13,140 MWh [4]
Electricity billAt $48 to $53 per MWh: about $630,000 to $700,000 a year [4]
Cooling water, if evaporativeAbout 9 to 26 million litres (1 to 3 m³ per MWh) [9]; KAPSARC uses 25 to 30 million [4]
Energy to desalinate itAbout 14 to 150 MWh: 0.1% to 1.1% of the site's electricity [27]
Price of that waterAbout $2,400 to $16,000 a year, at Gulf desalination tariffs of $0.28 to $0.53 per m³ [25, 26]
Building, onceAbout $9 to $13 million; the computers about $20 million [13, 14, 21]

For an operator, water is cheap and electricity is the main running cost. For the country, the question is where the water comes from and how secure that supply is.

Industrial electricity costs about $0.05 to $0.07 per kWh in Riyadh and Abu Dhabi [19]. Sources as numbered.

4 · Cost

The money, and the counter-view

The money

  • The UAE and Saudi Arabia: more than $100 billion committed to AI and technology [11]
  • Stargate UAE: up to $10 billion; Microsoft: $15.2 billion in UAE data centres since 2023 [17]
  • GCC AI data centres: $5 to $7 billion in 2026 alone [22]
  • WEF with Bain: more than $1 trillion of value across MENA by 2030 [10]

The counter-view

  • A December 2025 study finds the total cost of a 100 MW data centre similar in the US and the UAE; it calls its figures provisional [20]
  • It sees subsidies, business opportunities or hedging, not cost, behind the interest [20]
  • KAPSARC: how fully the machines are used matters more than the electricity price; one source finds Saudi costs up to 30% lower [4]

Sources: Enterprise [11]; Informa [17]; Analysys Mason [22]; World Economic Forum [10]; Centre for the Governance of AI [20]; KAPSARC [4].

4 · Cost

The war has made security a cost

1 March 2026

Drones hit three Amazon data centres: two in the UAE directly, one in Bahrain damaged by a strike nearby. [62, 63]

50 million people

Banking, payments and consumer services were disrupted across the region. [66]

Six months on

Amazon could not restore its Bahrain facility or one of its three UAE zones. [63]

About $150 million

The reported cost to Amazon. Standard insurance excludes war. [64]

$250,000 to $5 million

Yearly war cover on a $100 million policy, before the war and in April 2026. [65]

$3 billion to $100 million

The most a single data-centre property could be insured for. [65]

Up to 5% more

Added to construction cost by stronger physical security. [64]

Redesign, not retreat

The UAE is revising a major campus towards dispersed, underground, blast-resistant buildings; Qatar's $20 billion partnership with Brookfield goes ahead. [63, 66]

Sources: Tech Policy Press [62]; Reuters via Insurance Journal [63]; Forbes via Moneywise [64]; Semafor (Aon) [65]; CSIS [66]. Confidence: high on the events, medium on the costs.

5 · North Africa

Egypt and Morocco: an earlier stage, tighter power and water

EgyptMorocco
Running14 data centres, about 60 MW [40]; about 20 MW of new capacity firmly committed [39]14 data centres, 1.5 MW in operation (Q2 2026); 140 MW under construction, 400 MW planned [37]
AnnouncedPlans of 400 to 500 MW, not yet funded; up to 200 MW for $1 billion (Vodafone, Elsewedy, Cassava); up to 192 MW for $2.1 billion (Gulf Data Hub, Elsewedy) [39]; Project Atlas, 180 MW for about $2.15 billion, late 2028, not yet financed [61]Iozera, Tetouan, 386 MW [37]; Igoudar Dakhla, 500 MW green campus, studies launched April 2026 [54]
ElectricityGas made 81% of the power mix in 2024 [42], increasingly imported [39]; power cuts to ration gas from July 2023 [46]; renewables target 45% by 2028 [44]Coal 58% of electricity in 2025, 52% by 2030 (IEA figures) [50]; renewables 46.1% of installed capacity [51]; grid limits slow projects [37]
WaterAbout 500 m³ per person a year, half the UN water-poverty line; demand 88.55 billion m³ against 65.35 billion renewable [47]; the Nile gives over 98% [48]Desalination gives 25% of drinking water, 60% targeted by 2030 [52]; the Casablanca plant due in February 2027 [53]

Sources as numbered in the full briefing, section 5. Not covered: Algeria, Tunisia, Libya.

5 · North Africa · our calculation

What the announced projects would mean

2–2.5%

of Egypt's electricity

400 to 500 MW run all year at a PUE of 1.5: about 5.3 to 6.6 TWh, against 263 TWh planned for 2026/27, today mostly from gas. [42, 45]

5–6%

of Morocco's installed capacity

A 500 MW campus needs about 600 to 750 MW of supply. On the grid most power is coal, so its emissions depend on its own renewable supply. [37, 50, 51]

<0.01%

of Egypt's water demand

A 100 MW site with evaporative cooling: about 0.9 to 2.6 million m³ a year. The question is local: where it draws its water, on the hottest days. [9, 23, 47]

“Our calculation” = our arithmetic from the published figures cited.

6 · For the research

Assessing the impacts

ImpactWhat the evidence saysFor this regionConfidence
Electricity1.5% of world electricity in 2024, just under 3% by 2030 [1]Saudi 0.85%, 2.8% to 11.6% by 2030 [4]; UAE 2% to 3%, about 6% by 2028 [18, 57]Medium
Fuel and climateAbout 180 Mt of CO₂ a year, 0.5% of combustion emissions, 1% to 1.4% by 2030 [70]Gas and oil make over 90% of the power [56]; Saudi up to 24 Mt in 2030 [4]Medium
WaterTotals differ about twenty times with scope [5, 7, 11]At most about 3% to 3.5% of desalinated water, if all planned capacity used it (our calculation) [4, 56, 59]Low to medium
Air and healthUS data centres: health burden could pass $20 billion a year by 2028 [68]No study foundLow here
Electronic wasteGenerative AI: 1.2 to 5 million tonnes by 2030 [69]No study foundLow here
SecurityData centres became targets in war [62, 63]Sites not restored; war cover far dearer [63, 65]High
BenefitsAI could cut about 1,400 Mt of CO₂ in 2035 if widely adopted; nothing yet ensures it [70]More than $1 trillion by 2030: a modelled estimate [10]Low to medium

Not covered: land use, noise, local communities, and AI's own effects on jobs and society.

6 · For the research

What is not known: ask an expert first

Capacity counts

Saudi Arabia 476 or 290.5 MW; the UAE 358 or 400+ MW, while Khazna alone reports 673 MW. [4, 15, 17, 58, 60]

UAE electricity

About 3 TWh or 5.6 TWh in 2025, depending on the source. [18, 57]

Water totals

The market estimates for the UAE and Saudi Arabia give no method. [11]

Cooling and water sources

Published only for Khazna's sites, as far as we found. [12]

Indirect water

No regional estimate of the water used to make the electricity these sites buy.

Subsidies and tariffs

Not public per project; Atlas's developer declined to give its tariff. [61]

North Africa

Egypt's running capacity is put anywhere from 15 to 60 MW. [61]

War costs

Figures come from brokers and press reports, not published accounts. [64, 65]

Sources as numbered in the full brief, section 6.

7 · Risks and open questions

What could go wrong

Capacity may not arrive

The gap between announced and running is large; KAPSARC advises sequencing to avoid stranded assets. [4, 15, 16]

Water security

Dependence on desalination, and strikes on desalination plants during the Iran war. [11]

Peak demand

Cooling water and electricity both peak on the hottest days; AI loads can spike sharply. [10, 23]

Weak data

No standard measure for water; estimates differ about twenty times. The UAE's report asks for comparable reporting. [5]

North African grids

Grid limits slow projects in Casablanca; Egypt rationed power in 2023 to save gas. [37, 46]

Emissions

Saudi data centres could emit up to 24 Mt of CO₂ in 2030 on a fossil grid, about 7.7 Mt with 50% renewables. [4]

Public acceptance

In the US, 75 projects worth about $130 billion were blocked or delayed in Q1 2026, often over water and power. [9]

War and security

Data centres became targets; war is excluded from standard insurance, and war cover has become far dearer. [63, 64, 65]

Sources as numbered in the full brief, section 7.

For the research

Start here: the studies to read first

1

IEA, Energy and AI (2025) and Key Questions (2026). The world baseline, emissions and scenarios to 2035. [1, 2, 70]

2

IEA, The Future of Electricity in the Middle East and North Africa (2025). The region's power mix, cooling and desalination to 2035. [56]

3

IEA, Powering Artificial Intelligence (2026). AI capacity against water stress; water used in power. [3]

4

KAPSARC, AI and Energy: The Future of Data Centers in Saudi Arabia (Dec 2025). The most detailed national study in the region. [4]

5

UAE Mission to the UN with Eurasia Group, Crosscurrents (Oct 2026). The AI, water and energy link, with five recommendations. [5]

6

Middle East Council on Global Affairs, Desert Bytes (April 2026). Water and energy limits on Gulf AI data centres, with policy proposals. [67]

7

UN University (UNU-INWEH), Environmental Cost of AI's Energy Use (June 2026). Carbon, water and land footprints by source. [6]

8

Turner & Townsend, Data Centre Construction Cost Index (2026). Build cost, market by market. [14]

9

North Africa: BMI (Fitch Solutions) on Morocco; Enterprise on Egypt (2026). Running and announced capacity. [37, 39, 40, 61]

Every link is in the source list of the full briefing.

8 · The experts to ask

Researchers

Prof. Kaveh Madani

Director, UN University Institute for Water, Environment and Health

Led the June 2026 UN report on the carbon, water and land footprint of AI's electricity; 2026 Stockholm Water Prize laureate. [6]

unu.edu/inweh

Dr. Miriam Aczel

Researcher, UNU-INWEH

Lead author of the same report: methods, and the trade-offs between carbon, water and land. [6]

unu.edu/inweh

Prof. Shaolei Ren and Prof. Adam Wierman

UC Riverside; Caltech

AI's water footprint, including peak-day demand, and the public health cost of data centres. [23, 68]

Emails published on their papers

Khaled Alshehri

Fellow, KAPSARC (Riyadh)

Lead author of the most detailed public study of Saudi data-centre energy, emissions and cost. [4]

kapsarc.org

IEA Energy and AI team

International Energy Agency, Paris

Authors of the reference global studies, including AI capacity in water-stressed areas. [1, 2, 3]

iea.org

Dr. Asaf Tzachor

Reichman University

Co-author of the study on generative AI's electronic waste. [69]

Reichman University

We do not know them personally: the routes shown are their public institutional channels.

8 · The experts to ask

Policy and security

Abdalftah Hamed Ali and Mohammad Abu Hawash

Middle East Council on Global Affairs, Doha

Authors of Desert Bytes (April 2026): the water and energy limits on Gulf AI data centres. [67]

mecouncil.org

Nick Kraft

Senior Analyst, Water and Agriculture, Eurasia Group

Led the research behind the UAE's Crosscurrents report (Oct 2026). [5]

Eurasia Group

Jessica Obeid

Founding partner, New Energy Consult (Dubai)

Energy engineer and policy consultant, formerly at Chatham House and UNDP in Beirut. [11, 34]

New Energy Consult; WEF profile

Dr. Naser Alsayed

Gulf water and energy policy researcher

Writes on Gulf water security for AGSI and MEI; quoted as senior fellow at the Fiker Institute. [11, 35]

AGSI; Fiker Institute

Mohammed Soliman

Senior fellow, Middle East Institute

Technology and geopolitics; quoted on the physical limits of the Gulf's data-centre boom. [36, 38]

mei.edu

Joseph A. Farsakh

Middle East Program, CSIS (Washington)

Wrote on what the Iran war is costing Gulf-US AI plans. [66]

csis.org

We do not know them personally: the routes shown are their public institutional channels.

8 · The experts to ask

Water, North Africa, industry and operators

Youssef Brouziyne

Regional representative for MENA, IWMI

Co-author on MENA's water reality for AI; IWMI works on treated-water reuse. [24]

IWMI

Karikari Achireko

Africa Sustainable Energy Centre (ASEC)

Wrote for the World Economic Forum on whether Africa's grids are ready for AI data centres. [55]

ASEC; World Economic Forum

Dr. Minh Khoi Le

Global Head of Data Center and Hydrogen Research, Rystad Energy

Built the global model of data-centre cooling water and the dry-cooling trade-off. [7, 8]

Rystad Energy

Alan Coary

Data Centre lead, Middle East, Turner & Townsend

Construction cost of data centres in the region. [14]

Turner & Townsend

Elisabetta Baronio

ESG Director, Khazna Data Centers (UAE)

The operator side: published water, energy and climate-risk data for UAE sites. [12]

Khazna Data Centers

Aly Sheta

Head of Strategy and Digital Infrastructure, Income (Egypt)

The developer side in North Africa: Project Atlas, 180 MW to sell computing to Europe. [61]

Income Egypt

We do not know them personally: the routes shown are their public institutional channels.

8 · The experts to ask

Questions worth putting to them

1

Which water figure do you use, and why?

Direct cooling, consumption including power, or the full footprint.

2

For a Gulf site, which cooling is better overall?

Evaporative with desalinated or treated water, against dry or liquid cooling.

3

How much of the announced capacity will run by 2030?

4

What share of national electricity and desalinated water could data centres take, country by country?

5

Which rules on water reporting, siting or tariffs are coming in the region?

6

In Egypt and Morocco, where would the power and cooling water come from?

7

How should the war change where and how data centres are built and insured?

The full research brief

Every figure, every source

15 pages, 70 numbered sources and 18 experts, with a confidence level on each point and what is not known.

Prepared by Rawad and our team at the request of Ricardo Khoury, 24 November 2026, from published sources. Where the sources disagree, both are shown; our own arithmetic is marked “our calculation”.

Download the full research brief (PDF, 15 pages)
Scroll for more

Click, scroll or press the right arrow to turn the page

Turn your phone sideways for the full view

1 / 27